Port Said
The Port Said sewage treatment plant was established in area C9 south of Port Said, at a total cost of 45 million pounds, with a production capacity of 40 thousand M3/day.
The Port Said Sewage Plant serves 11 residential areas, with a population of 220 thousand people, and includes the Port Said Plant; a lifting station containing the Bayara and the operating room, the generator, the washers and the storage building, next to the slope networks completely constructed from U.P.V.C pipes and diameters (200mm-560mm), with a total length of 8 km, in addition to the parcel line consisting entirely of U.p.v.c pipes with a diameter of 400 mm and a total length of 2.5 km.