Port Said

The Port Said sewage treatment plant was established in area C9 south of Port Said, at a total cost of 45 million pounds, with a production capacity of 40 thousand M3/day.

The Port Said Sewage Plant serves 11 residential areas, with a population of 220 thousand people, and includes the Port Said Plant; a lifting station containing the Bayara and the operating room, the generator, the washers and the storage building, next to the slope networks completely constructed from U.P.V.C pipes and diameters (200mm-560mm), with a total length of 8 km, in addition to the parcel line consisting entirely of U.p.v.c pipes with a diameter of 400 mm and a total length of 2.5 km.

Egyfab manufactured more than one piece of equipment inside the Port Said Lifting Station, for its client "Hassan Allam" company, Under the Holding company for Potable Water and Waste Water in port said Management.

  • 2 Penstock (1500 mm * 1500 mm & 900 mm * 900 mm)
  • 2 Basket Screen ( 6 m * 4.6 m & 5.2 m * 3.6 m )

Among the previous works of “Egyfab” with “Hassan Allam” Company in lifting stations, the Assyut lifting station of "Nasser City", for which Egyfab manufactured the Penstocks for the intake station, and the middle Pump station under the management of the water and Waste Water company in Assyut.

  • 2 Penstocks